This paper aims to provide a solution method for the real-world hybrid flowshop scheduling problem resulting from a steelmaking process, which has important applications in modern iron and steel industry. We first present a mixed integer mathematic model based on a comprehensive investigation. Then, we develop a heuristic method and two improvement procedures for a given schedule based on the problem-specific characteristics. Finally, we propose an effective artificial bee colony (ABC) algorithm with the job-permutation-based representation for solving the scheduling problem. The proposed ABC algorithm incorporates the heuristic and improvement procedures as well as new characteristics including a neighboring solution generation method and two enhanced strategies. To evaluate the proposed algorithm, we present several adaptations of other well-known and recent metaheuristics to the problem and conduct a serial of experiments with the instances generated according to real-world production process. The results show that the proposed ABC algorithm is more effective than all other adaptations after comprehensive computational comparisons and statistical analysis.
No takes yet. Share an insight, caveat, or question.
Pan et al. (2012) studied this question.
Synapse has enriched 3 closely related papers on similar clinical questions. Consider them for comparative context: