Answers are grounded in this paper and cite their sources.
This paper develops a new multi-objective hybrid flexible flowshop problem with some useful constraints including of the limited waiting times (LWT) between every two successive operations, unrelated parallel machines at least one stage, sequence- and machine-dependent set-up times and due dates of jobs. A mathematical model for this problem as a mixed-integer programming is provided to simultaneously minimise the total weighted tardiness and maximum completion times. We applied two metaheuristic methods based on the Pareto approach, multi-objective Particle swarm optimisation and strength Pareto evolutionary algorithm II, to solve our problem and achieve the non-dominated Pareto frontier. To assess the performances of the presented algorithms and compare their results, a set of test problems in small and large sizes are created and then executed on the algorithms. Owing to the sensitivity of the values of parameters in the metaheuristic algorithms, a response surface methodology (RSM) as a strength statistical tool adjusts the parameters of both algorithms separately for small- and large-sized problems. The computational evaluation demonstrated that multi-objective Particle swarm optimisation is an effective and appropriate algorithm for our investigated problem.
No takes yet. Share an insight, caveat, or question.
Attar et al. (2013) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: