Key result
Major surgery was associated with a median platelet production time of 6.3 days compared to 7.0 days in controls.
Why the study?
Does major surgery affect platelet production time as measured by malondialdehyde activity renewal following aspirin suppression?
Observational
Does major surgery affect platelet production time as measured by malondialdehyde activity renewal following aspirin suppression?
Platelet production time, measured by MDA activity renewal after aspirin suppression, showed a median of 6.3 days in surgical patients compared to 7.0 days in controls.
Answers are grounded in this paper and cite their sources.
May shorten platelet production time after major surgery; leaves open effects on perioperative bleeding or dosing.
A study of platelet production time in major surgery is described. This was equated to the time taken for renewal of maximum malondialdehyde (MDA) activity in blood platelets following suppression by a single dose of aspirin (Stuart et al 1975). The method was simplified by using EDTA disodium salt as an anticoagulant instead of citrate, resuspending platelets with small bar magnets, and reducing time of incubation with thiobarbituric acid reagent from 1 h to 15 min. Results for maximum platelet renewal taken to be the time to achieve a pre-aspirin baseline level were median in surgery 6.3 (3.8-9.2) d and controls 7.0 (6.2-12.5) d. Using the modified method, average baseline malondialdehyde (MDA) levels were 6.2 +/- 1.4 nmol/10(9) platelets in surgical patients and 6.34 +/- 1.2 nmol/10(9) platelets in controls. Platelet production time determination using this method is not strictly analogous compared with survival of 51Cr-labelled platelets and it however warrants further study.
No takes yet. Share an insight, caveat, or question.
Burton et al. (1981) conducted an observational in Major surgery. Major surgery vs. Controls was evaluated on Platelet production time (time to achieve pre-aspirin baseline malondialdehyde level). Major surgery was associated with a median platelet production time of 6.3 days compared to 7.0 days in controls.
Synapse has enriched 10 related papers. Consider them for comparative context: