Answers are grounded in this paper and cite their sources.
The design and lightning performance data of the Tennessee Valley Authorty's (TVA) 161-kv and 115-kv sys-tem over a period of 21 years, a general guide for emergency loading of lines, and an analysis of interruptions due to lightning over a 4-year period are shown in tabular form. Maps and illustrations show the transmission system with the isokeraunic levels 1 and various types of construction. Conclusions are drawn on line performance and line design.
No takes yet. Share an insight, caveat, or question.
Chambers et al. (1962) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: