Answers are grounded in this paper and cite their sources.
Jobs with known processing times and due dates have to be processed on a machine which is subject to a single breakdown. The moment of breakdown and the repair time are independent random variables. Two cases are distinguished with reference to the processing time preempted by the breakdown (no other preemptions are allowed): (i) resumption without time losses and (ii) restart from the beginning. Under certain compatible conditions, we find the policies which minimize stochastically the number of tardy jobs.
No takes yet. Share an insight, caveat, or question.
Adiri et al. (1991) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: