Answers are grounded in this paper and cite their sources.
Has specialization of professional roles obstructed the holistic approach and sustainable development? A preliminary survey in Botswana involving construction professionals found that existing procurement systems have not integrated the efforts of the different project participants and also fail to fulfil the expectations of the users. A holistic approach involving the re-integration of construction disciplines by applying new procurement methods is proposed. An integrated, holistic way of working could provide a number of synergies through the consideration of the building project as an entire system. The implications include better decision making upstream, more efficient use of resources and the mitigation of negative environmental effects downstream. La spècialisation professionnelle est-elle un obstacle à l'approche globale et au dèveloppement durable? Une ètude prèliminaire menèe au Botswana et portant sur les mètiers de la construction a rèvèlè que les systèmes d'approvisionnement actuels n'intègrent pas les efforts des diffèrents participants à un projet et ne rèpondent pas aux attentes des utilisateurs. Cet article propose une approche globale dont le succès repose sur la réintégration de ces métiers et sur de nouvelles méthodes d'approvisionnement. Une méthode de travail intégrée et holistique, où un projet de construction serait considéré comme un système complet, pourrait faire naître un certain nombre de synergies. Cette hypothèse exige un meilleur processus décisionnel en amont une utilisation plus efficace des ressources et l'atténuation des effets négatifs sur l'environnement en aval.
No takes yet. Share an insight, caveat, or question.
A.B. Ngowi (1998) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: