Answers are grounded in this paper and cite their sources.
Estimation of optimal tunnel diameter is a challenging problem in the design of hydropower stations. Determination of tunnel diameter is a complex problem as it involves large numbers of variables. In this paper, a power tunnel design has been formulated as a geometric programming problem with a single degree of difficulty. Solution of the problem yields optimal tunnel diameter along with information regarding optimal contributions of various cost components in the total cost.
No takes yet. Share an insight, caveat, or question.
Swamee et al. (2012) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: