Answers are grounded in this paper and cite their sources.
The most viable method of forecasting the information required by the scheduling analyst when dealing with probabilistic networks is simulation. The major concern with this technique is the number of iterations required to produce viable decision-making information. The results of this study provide a basis for the selection of a reasonable number of iterations and are based on analysis of actual networks utilized to control projects of a probabilistic nature.
No takes yet. Share an insight, caveat, or question.
Keith C. Crandall (1977) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: