An online monitoring system applied to a recently built substation is described. It monitors the 204 kV and 72 kV gas-insulated switchgear and the transformer in their normal operating condition. The basic principle used to detect an abnormality is presented together with a record of the system's operation in the first year.>
No takes yet. Share an insight, caveat, or question.
Fujimoto et al. (1988) studied this question.
Synapse has enriched 2 closely related papers on similar clinical questions. Consider them for comparative context: