Answers are grounded in this paper and cite their sources.
This paper deals with the problem of determining planned leadtimes in a periodic loading system, such as ‘Material Requirements Planning.’ A method for determining planned leadtime for an individual job, based upon the operation time for the job, is presented from the standpoint that the planned leadtime should be determined under a management policy, taking a trade off between work-in-process quantities and capacity requirements variations into consideration. The proposed method, which is derived with Lagrange's method of indeterminate coefficients, can minimize capacity requirements variations under a given average loading time, under general operation time distributions.
No takes yet. Share an insight, caveat, or question.
Matsuura et al. (1993) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: