This is the authors' abstract. We don't add key points for this paper.
The rate of hydrogen removal from molten steel in a vacuum arc degasser (VAD) is simulated using a three‐phase (slag‐argon‐steel) Eulerian model. The time required to degas a 100 tonne melt from 5 to 1.5 ppm is predicted for a series of ladle aspect ratios and plug layouts. Compared to an axisymmetric single plug system, the degassing time can be reduced by 36% with the use of three equiangular plugs. Increasing the aspect ratio (AR) of the melt from 0.8–1.2 leads to an improvement in degassing performance, followed by a reduction in performance between AR = 1.2–1.6. A radial plug position of 0.5R is optimal for achieving low hydrogen levels in the melt. Reducing the inter‐plug angle from θ = 180° (for double plug) and θ = 120° (for triple plug) to θ = 45° further reduces this time by 18 and 3.8%, respectively. The fastest rate of hydrogen removal is obtained through the use of three plugs at positioned at an angle of θ = 45° and plug radial position of 0.5R.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Karouni et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: