With the integration of renewable energy and the increasing adoption of hydrogen, the energy structure and production schemes of long-process steelmaking enterprises urgently need to be upgraded. To address this issue, this paper proposes a stochastic model for the optimal dispatch of long-process steelmaking enterprises integrated with an electric-hydrogen system (EHS). A resource-task network is employed to mathematically characterize the detailed long-process steelmaking tasks, along with their associated materials and energy types. Furthermore, the uncertainties of renewable energy are captured through multiple power scenarios, resulting in a scenario-based model for steelmaking integrated with the EHS. To overcome the computational challenges posed by large-scale binary variables and numerous scenarios, a customized solution procedure is developed. This procedure decomposes the proposed model into a steelmaking master problem and scenario-wise EHS subproblems that can be solved in parallel, thereby enabling efficient solution of the large-scale scenario-based optimization problem. Simulation results demonstrate that the proposed model schedules steelmaking tasks and energy flows, reducing actual cost from $382,596.4 to $379,226.1, while the customized solution method reduces the runtime to 2,513.6 sec from over 24 hr without compromising accuracy.
No takes yet. Share an insight, caveat, or question.
Wu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: