This is the authors' abstract. We don't add key points for this paper.
Many scheduling problems are NP-hard problems. For such NP-hard combinatorial optimization problems, heuristics play a major role in searching for near-optimal solutions. In this paper we develop a genetic algorithm-based heuristic for the flow shop scheduling problem with makespan as the criterion. The performance of the algorithm is compared with the established NEH algorithm. Computational experience indicates that genetic algorithms can be good techniques for flowshop scheduling problems.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Etiler et al. (2004) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: