Answers are grounded in this paper and cite their sources.
Present speed control governors for hydroelectric installations employ constant gain settings. This paper develops appropriate gain functions of load level for optimal (deadbeat sense) transient response throughout the operating range. The results coincide with the Paynter numbers for the special case of best efficiency operation and consider the null conduit and reverse blading effects as additional special cases.
No takes yet. Share an insight, caveat, or question.
L. Wozniak (1975) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: