Answers are grounded in this paper and cite their sources.
A high-temperature critical superconductor (HTS) dipole magnet relying on 12-mm REBCO tapes was built at CEA Saclay in 2016. Magnet studies had been started in the framework of the EuCARD High Field Magnet program and continued within a collaboration agreement between CEA-Saclay and CERN. The final goal is to generate 5.4 T at 4.2 K in the 13-T background field of the FRESCA2 Nb3Sn dipole magnet. The HTS winding is made of three double-layer racetrack-type coils, wound from a stack of two double-layer REBCO tapes, stabilized with beryllium copper ribbons. Before it is installed inside the aperture of FRESCA2, at CERN, the magnet has been tested at CEA-Saclay in the standalone mode. In this paper, after a brief recall of the magnet design, we will report on the magnet manufacturing and the first powering tests results.
No takes yet. Share an insight, caveat, or question.
Durante et al. (2018) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: