Answers are grounded in this paper and cite their sources.
A new power conversion system is explored in this paper aiming wind turbines rated at the megawatt level. The proposed configuration consists of a medium-voltage, permanent magnet synchronous generator connected to a low-cost three-phase diode bridge rectifier, a dc-dc four-level boost converter as the intermediate stage, and a four-level diode-clamped inverter on the grid-side. The dc-link capacitor voltages are balanced by the boost converter, and thus the control complexity for the grid-tied inverter is greatly simplified. To control the boost converter and grid-tied inverter, a simple method based on a two-step model predictive strategy is presented. In the first part of this paper, the continuous- and discrete-time modeling of the proposed power conversion system is analyzed. The control objectives such as maximum power point tracking, dc-link capacitor voltages balancing, regulation of net dc-bus voltage, reactive power generation, lower switching frequency operation, and common-mode voltage minimization are considered in the design of controller.
No takes yet. Share an insight, caveat, or question.
Yaramasu et al. (2014) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: