Answers are grounded in this paper and cite their sources.
Modelling techniques are described to simulate the behaviour of a.c./d.c. systems following temporary d. c. line short-circuits. The basic tools employed are a small step dynamic simulation and a multimachine transient stability programme. Test results are shown to illustrate the speed of recovery from a d.c. short-circuit. The effects of fast fault detection, fault development and line re-energization controls are also discussed.
No takes yet. Share an insight, caveat, or question.
Heffernan et al. (1981) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: