This is the authors' abstract. We don't add key points for this paper.
Summary Water injection into soft sand is a global industry challenge because of the complex problem of maintaining sustained water-injection rates into the desired reservoir. Drilling, cementing, and completion engineers are addressing each technical and operational aspect of water injectors, including cement isolation. Cement serves as a barrier during well construction through to post-abandonment. It contributes to ensuring that no out-of-zone water injection occurs because of flow behind casing. If water does go out of zone, new drilling hazards that are a result of water breaching and a loss of reservoir management will occur. At present, as far as we know, the industry does not have a systematic methodology for defining and verifying the required physical and mechanical properties of the cement to endure water-injection service and to retain its isolation capability during well life. Cement-integrity simulators (CISs) provide different answers, mainly because they all assume a different initial stress-state in the cement after hydration. As a consequence, a new CIS model that computes this stress state has been developed, along with a large-scale testing setup to validate its predictions. The new model incorporates key-design parameters of effective CIS models: (1) The initial stress state after cement hydration is computed; (2) varying loadings that the cement sheath is submitted to are simulated; (3) the elasticity, plasticity, and failure of materials are taken into account; (4) the simulations are fast enough to facilitate sensitivity analysis; and (5) the model outputs allow the visualization of cement integrity across the entire length of the cement sheath, adjacent to reservoirs and to seals. Parallel to the modeling work, a large-scale test apparatus was built to evaluate cement zonal isolation under water-injection pressure and temperature conditions. Its objective was to generate pressure and temperature cycles inside sections of cemented casing assemblies to replicate the conditions of pressure and temperature variations in a water-injection well. The results of the test confirmed the accuracy of the new CIS model. They also showed that cooling because of water injection had a bigger impact on cement integrity than increasing pressure. In addition, the results showed that microannulus generation had more effect than tensile cracking in terms of cement-barrier-permeability increase.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Thérond et al. (2017) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: