Answers are grounded in this paper and cite their sources.
An approach for a real-time adaption of the dead time for autoreclosing on high-voltage lines was proposed. The objective was the optimal adaption of the dead time of a currently running single-phase autoreclosing cycle by calculating the secondary arc current based on measurements. The algorithms for optimization were performed for real-time applications. For this purpose, the fault location plus the load currents of the parallel nonfaulty conductors were measured. The measurement and the calculation of the dead time took place during the fault and the dead-time period. In this way, an optimized dead-time setting with regard to the actual fault location and loading conditions were achieved. This approach results in an online determination of the minimum necessary dead time of a successful reclosing under consideration of the fault location and prevailing loading conditions. Analytical calculations and numerical examples as well as high-voltage field tests verified the results.
No takes yet. Share an insight, caveat, or question.
Vogelsang et al. (2015) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: