Answers are grounded in this paper and cite their sources.
Introduction Statistical process (SPC) is by now a commonly used quality assurance tool. One of the most important SPC techniques is the use of charts for maintaining process performance; their effectiveness lies in their ability to alert users of any deterioration of process behaviour so that potential damage can be alleviated or averted in time. As a result, the attention of chart users, mostly technical personnel, is normally focused on process deterioration. From a management point of view, the ability to detect process improvements in the form of of control states is no less important, since improvements can take place as a result of process stabilization or learning effects. In this article we address this subject with reference to a conventional process chart and its application in a high yield or low defective manufacturing environment, and offer some practical implementation procedures. Many manufacturing processes today have attained quality levels far higher than those commonly found when Shewhart charts were first proposed in the 1920s[1]. One of such charts, namely np-chart for the of nonconforming items (defectives), faces some implementation problems when the proportion nonconforming p is low and the size of each sample n is not large enough. In particular, based on 3ơ deviation from process mean, the lower limit (LCL) is often below zero which has no physical meaning. It is often advised in textbooks or journal papers that this LCL be ignored or zero be taken instead as the lower limit. However, such practice contradicts the fundamental idea of SPC by charts. A process is judged out of when it, with a certain probability, performs worse than expected; in such a case action should be taken to make the necessary corrections to the process. The process may also be out-of-control in the sense that it has become better than expected; in such a situation useful information can be sought about how the new-found quality improvement may be sustained. This is an extremely valuable opportunity not be missed, as continuous improvement is now the cornerstone of modern quality management.
No takes yet. Share an insight, caveat, or question.
Xie et al. (1993) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: