Maintaining frequency stability is one of the three dynamic security requirements in power system operations. As an emergency control, event-driven load shedding (ELS), which is determined preventively and triggered immediately after fault occurrence, can effectively prevent frequency instability. This study proposes a methodology for real-time predicting required ELS against severe contingency events. The general idea is to train an extreme learning machine-based prediction model with a strategically prepared ELS database, and apply it on-line for real-time ELS prediction. The methodology can overcome the shortcomings of conventional deterministic approaches by its high generalisation capacity and accuracy. It can either be an individual tool or a complement to deterministic approaches for enhancing the overall reliability of the ELS strategy. Its feasibility and accuracy are verified on the New England 10-machine 39-bus system, and the simulation results show that the prediction is acceptably accurate and very fast, which is promising for practical use.
No takes yet. Share an insight, caveat, or question.
Dai et al. (2012) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: