This is the authors' abstract. We don't add key points for this paper.
Many startups have been established in the world and there are many proposals on fusion reactors. Startups attract investment for the design and construction of fusion reactors. The development of high-temperature superconducting (HTS) tapes allows magnets to be demountable, making the vacuum vessel (VV) to be constructed independently of the magnet manufacturing process. The size of the VV is limited by the plasma facing material (PFM). High magnetic field reactors can generate more energy, but there is a limit to the heat load on the PFM. Since the VV is a nuclear boundary, welding must be flawless. To create a more effective design and clearly identify key problems, a targeted reactor design is necessary. A 300 MWe fusion reactor design was attempted and its size and structural components were visualized. HTS demountable TF magnets are expected, for it makes it possible to carry out VV sector-to-sector welding from both the inside and outside and it would reduce the welding flaws. Also, welding and non-destructive inspection of VV sector-to-sector were considered. This study describes some practical key issues on the design of a fusion reactor to be solved in near future, assuming 300 MWe fusion reactor.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
A. Nishimura (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: