This paper develops a data-based stochastic reliability model for the Raw Mill system considered in a cement-manufacturing case study. The analysis uses 80 structured failure, inspection and preventive-maintenance events over 2,900.38 h. A semi-Markov and regenerative-point framework is used because the system can move among full operation, degraded operation, inspection, corrective repair, preventive maintenance and complete failure, while repair duration does not satisfy a simple exponential assumption. Inter-failure time is represented by an exponential model with an estimated rate of 0.021085 h-1, whereas the Weibull distribution gives the best parametric approximation for repair time. The estimated mean time to system failure is 95.9448 h and steady-state operational availability is 0.9268. Reliability falls from 0.7205 at 24 h to 0.3238 at 96 h. Separator, Grinding and Feeding create the largest combined operational burden. Under normalized economic assumptions, long-run expected profit is 355.7148 units/h; a coordinated improvement scenario raises it to 366.1774 units/h. The results show that failure prevention, quicker restoration and condition-based intervention should be evaluated together rather than as separate maintenance decisions.
No takes yet. Share an insight, caveat, or question.
Nitika et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: