Answers are grounded in this paper and cite their sources.
Cement grinding relies on interacting electrical and mechanical equipment, for which an apparently minor fault can reduce throughput or progress to a complete interruption. This study compares two maintenance policies within a common seven-state stochastic reliability model. Model I permits a developing or neglected fault to progress to serious failure, Model II replaces that route with successful preventive intervention. The models retain identical category-specific fault occurrence intensities and use semi-Markov transition distributions, regenerative first-passage equations, and renewal-reward measures. Numerical inputs originate from a observed 24-month cement-grinding dataset containing 214 fault events over 16,259.13 operating hours, unobserved escalation and restoration behaviour is specified as hypothetical. Under the exponential particular case, operating-time mean time to system failure increases from 164.10 h (corrective policy) to 207.17 h (preventive policy), a 26.24% increase. Long-run binary availability increases from 97.88% to 98.32%, while modelled profit rises from approximately ₹89,647 to ₹90,430 per hour under the stated throughput and cost assumptions. Reliability functions and a break-even policy-cost calculation provide additional insight into this trade-off. These are conditional simulation-based findings, not measured improvements at an industrial installation. The results illustrate a transparent framework for evaluating when early intervention in developing faults justifies its maintenance burden.
No takes yet. Share an insight, caveat, or question.
Nitika et al. (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: