Answers are grounded in this paper and cite their sources.
The design effort required to complete a project is an important aspect of a project. It impacts the final cost, as well as the lead-time of a project. In this paper, a case study, which is carried out at Pratt & Whitney Canada, a global leader in the design and manufacture of aircraft engines, is presented. A Parametric model is proposed to estimate the design effort required in for a particular department to complete their design phase of an integrated blade-rotor low-pressure compressor fan. In a sensitivity analysis, the model estimation is compared with the actual estimates and the comparison demonstrates that the parametric model results in a good estimation. The analysis further explores the impact of various factors used to develop the parametric model, as well as demonstrates the significance of the proposed modeling methodology.
No takes yet. Share an insight, caveat, or question.
Salam et al. (2008) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: