This is the authors' abstract. We don't add key points for this paper.
Proton exchange membrane (PEM) electrolysis coupled with wind power is a promising pathway for low-carbon hydrogen production, but annual renewable-energy accounting can obscure temporal mismatches between renewable generation and electrolyser demand. This study develops a GREET-informed production-stage carbon-intensity framework and applies it to an illustrative New South Wales (NSW) case at a 0.56 MW PEM scale. A normalised hourly NSW wind profile was scaled to project level and evaluated under four accounting and operational scenarios to distinguish the effects of annual versus hourly electricity matching, temporal grid-emission accounting, and wind-constrained operation. Although annual potential wind generation was matched to annual PEM electricity demand, hourly matching showed that 25.96 % of the electricity required for continuous operation was supplied by the grid. The corresponding core carbon intensity increased from 0.072 kg CO 2 -e kg −1 H 2 under annual-energy accounting to 9.425 kg CO 2 -e kg −1 H 2 under hourly matching. Applying temporally resolved grid-emission factors further increased the core carbon intensity to 9.726 kg CO 2 -e kg −1 H 2 , with grid-related emissions 3.22 % higher than under annual-average accounting. Eliminating grid electricity reduced PEM utilisation to 44.85 %, highlighting a trade-off between grid avoidance and hydrogen production. The results demonstrate that renewable-hydrogen carbon accounting is strongly influenced by the temporal alignment of renewable supply, electrolyser demand, and grid-emission conditions.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Chen et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: