Under ultra-shallow-buried, water-rich soft ground conditions, deformation control is highly sensitive when the pipe-roof method is used to underpass an operating high-speed railway. Excavation disturbance may induce coupled settlement of the tunnel crown, ground surface, and existing track, directly threatening the operational safety of the high-speed railway. To address the limited availability of field monitoring data, the significant spatiotemporal coupling of settlement responses, and the discrepancy between numerical simulations and actual engineering conditions, a physics-guided deep learning method for construction-induced settlement prediction, termed PG-STGAT, is proposed. In this method, crown, ground, and rail monitoring points are represented as graph nodes, and the graph structure is constructed based on spatial proximity and deformation-transfer mechanisms. A temporal convolutional network and a graph attention network are adopted to extract the temporal evolution and spatial correlation features of settlement, while data fitting, temporal continuity, spatial coordination, and deformation-transfer consistency constraints are introduced into the loss function. Nine sets of FLAC3D simulation data under multiple working conditions are used for pretraining, followed by fine-tuning with field monitoring data to achieve transfer from simulation data to real engineering data. The engineering case results show that PG-STGAT achieves RMSE, MAE, MSE, WMAPE, and R 2 values of 0.1048 mm, 0.0614 mm, 0.0110 mm 2 , 7.97%, and 0.9869 on the test set, respectively. Ablation analysis verifies the effectiveness of physics guidance, graph attention, and temporal feature extraction. With only 5% of the field monitoring data used for fine-tuning, the R 2 remains 0.9129, and the model maintains good predictive performance under 20% noise. Model interpretability analysis further reveals the information-transfer relationships among crown, ground, and rail settlement and verifies the physical consistency of the prediction results. The proposed data-physics fusion approach provides a potentially effective tool for accurate prediction of construction-induced settlement during pipe-roof underpassing of an operating high-speed railway.
Answers are grounded in this paper and cite their sources.
No takes yet. Share an insight, caveat, or question.
Gao et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: