Answers are grounded in this paper and cite their sources.
Open-pit metal mines require carbon-management tools that connect heterogeneous operational data with process-level accounting and prospective production-plan assessment. This study developed an integrated carbon-emission assessment and decarbonization decision-support system combining a MySQL database, standardized data interfaces and batch imports, a process-level accounting model, and a production-plan-driven scenario model. The boundary covers drilling, blasting, loading, haulage, crushing, beneficiation, and tailings handling, with land-disturbance-induced carbon-stock loss assessed separately. The deployed system was evaluated at the Julong open-pit copper mine using 2025 historical records for computational verification and the 2027 monthly production plan for conditional scenario assessment. Absolute relative differences for electricity, diesel, explosives, and mine-wide emissions were below 3%, with a mean absolute relative difference of 0.99%. Under the 2027 baseline, annual emissions were 1762.53 kt CO2 eq. The combined mitigation scenario reduced emissions by 21.65% and lowered emission intensity from 8.49 to 6.65 t CO2 eq/t concentrate. These results show that the system integrates historical carbon-emission assessment with production-plan-driven decarbonization screening and converts process data into traceable evidence for comparing mitigation options. It therefore serves as a carbon-focused decision-support tool for sustainability-oriented mine planning, although broader applicability requires multi-mine validation and explicit uncertainty analysis.
No takes yet. Share an insight, caveat, or question.
Bai et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: