Converter-dense campuses that combine large digital loads, hydrogen production, and battery storage at one point of interconnection (POI) require coordinated assessment across planning timescales. This paper presents a reproducible workflow that links steady-state and N-1 power flow, electromechanical frequency dynamics, frequency-dependent network impedance, harmonic screening, and electromagnetic-transient (EMT) fault recovery. The principal benchmark adds a 500 MW data center and a 500 MW electrolyzer load to the IEEE 39-bus system, with a 100 MW/400 MWh battery energy storage system (BESS) in the coordinated topology. The 1 GW load is a severe hosting-capacity stress case, not a proposed rating for this network; generality is tested at 500, 750, and 1000 MW, at three POIs, for three generator contingencies, and in a separate WECC 179-bus portability case. At the IEEE 39 reference POI, passive co-location reduces voltage to 0.936 p.u. Coordinated reactive support raises it to 0.947 p.u., but neither that case nor 29 additional local mitigation variants satisfies the benchmark-relative N-1 target. In WECC, where the same facility is 1.65% of demand, the corresponding voltages are 0.956 and 0.963 p.u. Post-contingency electrolyzer curtailment improves frequency nadir in both networks. The IEEE 39 prescribed-spectrum screening gives 6.84% and 7.10% voltage total harmonic distortion (THD-V) for passive and coordinated co-location; the WECC values are lower but remain above the 1.5% limit. ParaEMT provides a time-domain consistency check for harmonic propagation and exposes load-model sensitivity in low-voltage ride-through (LVRT) results. The output is therefore a planning synthesis with explicit evidence levels and validation gates, rather than universal connection requirements.
No takes yet. Share an insight, caveat, or question.
Mohamed Shamseldein (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: