Answers are grounded in this paper and cite their sources.
High penetration of distributed photovoltaic (PV) generation complicates coordinated PV–energy storage system (ESS) planning and network operation, especially where discrete and continuous reactive-power devices coexist. This study develops a screening-assisted planning–operation framework incorporating capacitor banks (CBs) and static var compensators (SVCs). A time-averaged voltage-stress index (TVSI) and network-loss sensitivity (NLS) identify candidate installation buses. The screened layout A1 is compared with the reference layout A0 at matched PV/ESS ratings under prescribed and coordinated reactive-power control. Under coordinated control, A0 achieves 1.14% lower daily operating cost and 13.17% lower physical voltage deviation than A1; thus, the screened layout is not adopted for subsequent capacity planning. At the retained A0 sites, PV/ESS capacities and seasonal dispatch are jointly optimized using single-level mixed-integer second-order cone programming (MISOCP) with relaxed branch-flow constraints. The formulation includes PV availability and curtailment, ESS state-of-charge dynamics, voltage and branch-current limits, CB configuration-change limits and stage-operation costs, and a unified upstream electricity-purchase boundary. Four-season profiles and probability-weighted PV–load–price scenarios support deterministic and scenario-based planning, with common-input evaluation and independent alternating-current (AC) power-flow verification. In the IEEE 33-bus system, coordinated control reduces A0’s physical voltage-deviation index by 42.96% relative to prescribed control, at a higher daily cost. Scenario-based planning yields a 0.43% lower observed annualized test cost than deterministic planning on the common 30-day sample, while both satisfy the checked AC limits.
No takes yet. Share an insight, caveat, or question.
Yongfeng et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: