In this study, the applicability of the Risk Priority Number (RPN) approach to maintenance prioritization in photovoltaic (PV) systems was investigated using field data from 200 public PV plants in Jincheon-gun, Republic of Korea.Visual inspections, current-voltage (I-V) measurements, and inverter fault histories were analyzed to reassess the system conditions and recalculate RPN values under real operating environments.To better reflect field characteristics, occurrence scores were determined by incorporating both literature-based estimates and actual fault recurrences derived from operational records.Among the 192 analyzable systems, 130 were classified as abnormal and 62 as normal according to I-V diagnostics; eight sites were excluded owing to measurement limitations.The recalculated RPN values showed a clear separation between normal (1-10) and abnormal systems (40-270), with a median value of 84 for the latter.On the basis of predefined risk thresholds, 40 systems were classified as requiring priority inspection, 27 as high-risk, and four as critical, indicating that a considerable portion of the portfolio demands immediate or near-term maintenance actions.A detailed examination of high-risk systems revealed that electrical faults, combined with repeated fault occurrences, played a decisive role in elevating the risk levels.In particular, bypass diode failures, hotspots, and combiner box or string faults were frequently observed in the upper risk tiers, often accompanied by degradation-related phenomena such as aging and shading-induced mismatch.These findings suggest that not all frequently observed defects contribute equally to operational risk and that fault recurrence and electrical impact should be jointly considered in maintenance prioritization.The results confirm that the RPN, when calibrated with field-acquired data, can serve as a practical tool for identifying high-risk PV systems and supporting maintenance decision-making in large-scale public PV portfolios.The proposed approach enables the systematic prioritization of inspection and repair activities based on actual operational behavior rather than solely on predefined failure assumptions.
No takes yet. Share an insight, caveat, or question.
Choi et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: