Answers are grounded in this paper and cite their sources.
Physical construction projects frequently encounter the Iron Triangle crisis, characterised by persistent cost overruns, schedule delays, and quality compromises. Despite significant advancements in digital tools like building information modelling and digital twins, the global construction industry continues to struggle with systemic underperformance. This struggle is largely rooted in an institutional void created by the temporary nature of project teams and a traditional reliance on rigid, adversarial contractual frameworks. This systematic literature review investigates the disparity between modern engineering capabilities and frequent project failures by identifying specific management commitment mechanisms that contribute to sustainable performance in both public and private sectors. Utilising the PRISMA framework and PICO methodology, the study analysed a core dataset of 22 articles from the Scopus database. Thematic analysis identified five critical dimensions of management commitment: relational governance and alliance, organisational justice and fairness, in-house capability and continuity, strategic resources and knowledge integration, and adaptive leadership and empathy. These commitment mechanisms are contrasted against five systemic failure categories, including strategic bias and misrepresentation, structural and information fragmentation, the planning fallacy (optimism bias), adversarial inertia, and organisational amnesia. The study proposes a conceptual framework. These findings provide a foundation for practitioners to transition from being passive managers to becoming proactive strategies.
No takes yet. Share an insight, caveat, or question.
Tan et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: