Current levelized cost of hydrogen (LCOH) and emission studies often assume fully flexible electrolyzers operating only in low‐price hours, ignoring baseload constraints. Here, a techno‐economic analysis (TEA) and life‐cycle assessment (LCA) based on Aspen simulations are conducted for five different power‐supply scenarios for electrolysis. Note that 10% year‐round baseload mirrors industrial degradation constraints. Results show that low full load hours (FLH) are the main cost driver for LCOH. A realistic German LCOH span 6–10€ kg −1 with OPEX dominating above 4000 FLH. Grid supportive electrolysis exceeds the carbon footprint of fossil steam methane reforming by a factor of 2 and exhibits LCOH comparable to electrolysis with electricity procured from a green Power‐Purchase Agreement (PPA).
No takes yet. Share an insight, caveat, or question.
Göbel et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: