Answers are grounded in this paper and cite their sources.
Non-invasive estimation of reinforcement corrosion from the deformations of reinforced-concrete (RC) structures requires measurement intervals matched to the evolution of the corrosion process. Fixed intervals chosen from a discrete candidate set give no accuracy control between visits. We therefore formulate measurement scheduling as error-controlled adaptive step selection. At each measurement, an a priori estimate of the local prediction error, obtained from the disagreement between linear and quadratic extrapolations of the inferred corrosion-current density, limits the next interval, and a proportional–integral controller adjusts it from the realised prediction error under a user-defined tolerance. All schedules sample the same monthly numerical reference trajectory. For a reference RC beam, the adaptive schedules dominate the 6- and 12-month fixed-interval baselines, reduce the peak scheduling error 2.4- to 3.2-fold for tolerances of 0.5% to 2% relative to equally spaced schedules with equal numbers of measurements, and reproduce this numerical reference within 0.21% of the baseline current density using fewer than one fifth of the monthly measurements. The benefit arises from non-uniform deterioration and vanishes for uniform deterioration; measurement noise requires a tolerance of at least four times the noise level. The scheduler is verified numerically; experimental validation under realistic monitoring conditions is still required.
No takes yet. Share an insight, caveat, or question.
Recha et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: