Green hydrogen is central to Europe's energy transition, but Nigeria-Europe export corridors lack a joint operations-research treatment of supply- and demand-side uncertainty, leaving capacity-sizing decisions without quantitative grounding. This study addresses that gap with the first two-stage stochastic mixed-integer linear programme (MILP) for a Nigeria-to-Europe liquid hydrogen (LH2) corridor. Solved in GAMS/CBC, the optimum selects Z1 (Kano/Jigawa) and Z2 (Sokoto/Kebbi) at 5.0 GW proton exchange membrane (PEM) capacity each, consolidates liquefaction at Apapa Port (406.8 kt LH2/yr), and achieves 84.6% weighted demand fulfilment at 1960.7 M USD/yr. The value of the stochastic solution is negative (VSS = −175.6 M USD, −9.8%), widening under capacity relaxation - an asymmetric penalty-cost structure, not scarcity; a low expected value of perfect information (EVPI, 1.2%) confirms infrastructure, not demand information, binds reliability. Capacity expansion, not improved forecasting, should anchor Nigeria's export policy.
No takes yet. Share an insight, caveat, or question.
Aasa et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: