Student-operated lathes in engineering education workshops fail unpredictably, and maintenance is typically reactive. The model treats the root-mean-square of the vibration velocity in the high-frequency band as a monotone degradation signal, defines a warning threshold from the ISO 10816 vibration severity zones, and derives the expected number of unplanned failures per lathe as a function of the inspection interval. A design and power analysis was conducted for the BACI estimator under a declared variance structure (between-cluster SD = 6.0, residual SD = 4.5, intraclass correlation = 0.64), with 2000 replications per design cell across 8, 16, 24 and 32 clusters and effect sizes of 3, 5 and 8 percentage points. The analysis indicates that 54 clusters are required to detect a 5-percentage-point reduction in unplanned downtime at 80% power. The binding constraint on predictive maintenance in educational workshops is not the degradation model but the cluster-level design of the evaluation, and that workshop networks should be sized accordingly before scheduling is deployed.
No takes yet. Share an insight, caveat, or question.
Diallo et al. (2026) studied this question.
Synapse has enriched 5 closely related papers on similar clinical questions. Consider them for comparative context: