Answers are grounded in this paper and cite their sources.
Industrial plants often need to plan maintenance using routine logs and few repeated failures per component. This study proposes a transparent, uncertainty-aware predictive-maintenance workflow that converts maintenance records into time-between-failures data and fits a location-shifted three-parameter Weibull model via Benard median ranks and Weibull probability-plot regression. Parameter uncertainty is quantified with 95% bootstrap confidence intervals, and model adequacy is verified using a bootstrap-adjusted Kolmogorov–Smirnov test. Applied to two sewing-machine components (tension wire and hook), the validated models indicate decreasing hazard rates (β<1) and provide reliability metrics that guide inspection scheduling, preventive replacement windows and spare-parts provisioning. The results underline the value of reporting uncertainty and validating fit when decisions rely on sparse field data.
No takes yet. Share an insight, caveat, or question.
Abir Mouldi (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: