Answers are grounded in this paper and cite their sources.
In this paper, we propose variable voltage task scheduling algorithms that minimize energy or minimize peak power for the case when the task arrival times, deadline times, execution times, periods, and switching activities are given. We consider aperiodic (earliest due date, earliest deadline first), as well as periodic (rate monotonic, earliest deadline first) scheduling algorithms. We use the Lagrange multiplier method to theoretically determine the relation between the task voltages such that the energy or peak power is minimum, and then develop an iterative algorithm that satisfies the relation. The asymptotic complexity of the existing scheduling algorithms change very mildly with the application of the proposed algorithms. We show experimentally (random experiments as well as real-life cases), that the voltage assignment obtained by the proposed low-complexity algorithm is very close to that of the optimal energy (0.1% error) and optimal peak power (1% error) assignment.
No takes yet. Share an insight, caveat, or question.
Manzak et al. (2003) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: