Answers are grounded in this paper and cite their sources.
The Evotherm warm mix process is the direct substitution of the asphalt binder with a cationic asphalt emulsion. The field trial in Canada demonstrates 30 °C and 60 °C reduction in the mix and compaction temperature, respectively, than the conventional hot mix with the same aggregate and asphalt. This results in 60–80% reduction in CO, NOx and SO2 emission. A procedure of recovering the representative asphalt emulsion residue for the asphalt emulsion based warm mix system was developed. Results of the Superpave binder characterization indicate that the pavement with the 3% SBR latex polymer-modified warm mix after 10–15 years of service would be as flexible as the fresh pavement with the conventional hot mix.
No takes yet. Share an insight, caveat, or question.
Koichi Takamura (2008) studied this question.