Answers are grounded in this paper and cite their sources.
Pile foundation scheduling of super-large engineering structure presents significant concerns and challenges due to the dynamically triggered and evolved vibration exclusion zones generated by impact boring. However, conventional resource-constrained project scheduling theories often exhibit spatial blindness, resulting in cascading construction critical path delays. Therefore, this study proposes a Topologically Adaptive Ant Colony Optimization (TA-ACO) algorithm embedded within a state-dependent simulation environment. The algorithm employs a dual-colony cooperative mechanism to effectively decouple the adversarial resource coupling between piling crews and grouting crews. Specifically, a novel look-ahead heuristic strategy is introduced, guiding crews to maximize spatial sparsity, which is analogous to solving the Maximum Independent Set problem and avoiding topological deadlocks. Computational experiments demonstrate that TA-ACO effectively mitigates spatial fragmentation and reduces the project makespan by 21.5% to 28.3% across different large-scale instances, compared to the industry-standard greedy strategy. The engineering application results of large airports show that the proposed algorithm compressed the construction period of a critical zone, which includes 97 pile foundations, from 47 days to 34 days, securing a valuable 13-day lead time for subsequent superstructure assembly.
No takes yet. Share an insight, caveat, or question.
Hao et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: