Answers are grounded in this paper and cite their sources.
Gas pipeline construction comprises route preparation, excavation or horizontal directional drilling (HDD), pipe transportation and stringing, lifting, welding, non-destructive testing, coating, lowering-in, backfilling, testing and tie-in activities. These operations may interact with existing buried utilities and live hydrocarbon systems, creating pathways to pipeline damage, loss of containment, fire, explosion and struck-by injury. This study develops a construction-phase risk assessment framework that integrates task-based hazard identification and risk assessment (HIRARC), Fault Tree Analysis (FTA), data-screened Quantitative Risk Assessment (QRA), and reliability improvement. Four top-event scenarios are formulated: (i) mechanical damage to an existing buried gas pipeline during excavation; (ii) fire or explosion during hot work; (iii) unexpected hydrocarbon release during construction or tie-in; and (iv) a dropped pipe or load striking a person during lifting. Preliminary fault trees separate initiating mechanisms, failed safeguards and exposure conditions, thereby clarifying the AND/OR relationships that must be validated. Documentary triangulation uses the supplied project report, relevant accident-investigation records, and technical guidance on FTA, excavation and hot-work controls. The industrial visit to Oil Terminal is treated only as contextual familiarisation; the visit photographs do not demonstrate the occurrence of any modelled event. The analysis identifies utility-location assurance, permit-to-dig, positive isolation, gas testing, hot-work control, lifting integrity, exclusion zones and communication as critical barrier themes. Since task-specific failure rates, exposure denominators and consequence parameters were not supplied, numerical probabilities, risk contours and risk-reduction percentages are intentionally not reported. The principal contribution is a transparent, auditable framework for validating construction-related fault trees and populating a QRA when reliable project data become available.
No takes yet. Share an insight, caveat, or question.
Patel et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: