Answers are grounded in this paper and cite their sources.
This paper is concerned with the performance of alternative dampening procedures to cope with system nervousness in manufacturing firms that employ a material requirements planning (MRP) system. It presents three dampening procedures to reduce rescheduling frequency of open orders. These procedures arc compared using a simulation study. The results indicate that the performance of a dampening procedure depends upon the operating environments of manufacturing firms. The results also show that the reduction of system nervousness, as measured by the frequency of schedule disruptions, does not necessarily lead to a better system performance. It is the appropriate employment of a dampening procedure and lot-sizing rule that can contribute to the system improvement.
No takes yet. Share an insight, caveat, or question.
Ho et al. (1996) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: