Answers are grounded in this paper and cite their sources.
The large-scale integration of distributed energy resources (DERs) is accelerating the transition of distribution systems from passive loads to active participants in transmission-side operation and market participation. However, this transition is hindered by two key challenges, one arising from renewable generation uncertainty and the other from the need to ensure that market-cleared schedules remain feasible under internal distribution-network constraints. To enable efficient participation in the transmission-side energy market, a risk-aware feasible region construction and bidding method for the distribution side with renewable generation is proposed. A family of risk-dependent power feasible regions is constructed to characterize the power exchange capability of the distribution side at the interconnection bus under renewable generation uncertainty. Based on these regions, a market profit evaluation model is developed to balance potential market revenue against operating costs and deviation penalties. Conditional value-at-risk is incorporated to quantify the tail risk associated with power delivery shortfalls, and the feasible region yielding the highest market profit is selected. The selected feasible region is further converted into a piecewise bidding curve based on the incremental operating cost across different power intervals. Case studies on a modified IEEE 33-bus system demonstrate that the proposed method can coordinate operational feasibility, renewable uncertainty, and market profitability while supporting implementable bidding decisions for the distribution side.
No takes yet. Share an insight, caveat, or question.
Zhu et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: