Answers are grounded in this paper and cite their sources.
For 2026 rare earth resource upgrades, blocks with block-scale relative variance above 30% on reportable block support must be deferred or require infill drilling. Independent technical note mirroring the canonical version: https://skymineral.com/blog/rare-earth-resource-upgrades-2026-30-variance-threshold-infill-or-defer.php
No takes yet. Share an insight, caveat, or question.
Tanner Briggs (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: