The global civil construction sector faces chronic structural inefficiencies, characterized by a low task completion reliability rate (PPC of 55–60%) and stagnant labor productivity. This study proposes an integrated Lean-Transformation-Flow-Value (TFV) operational framework tailored to civil engineering projects. By synthesizing macroeconomic datasets (McKinsey Global Institute, Funcas, U.S. Bureau of Labor Statistics) through a PRISMA-guided protocol and coupling them with a Discrete-Event Simulation (DES) model of a multi-span highway viaduct, this paper evaluates the operational transition from traditional Push scheduling to a synchronized Pull-JIT system. Quantitative findings indicate that non-value-adding activities account for up to 57% of total operational time in construction, compared to 26% in manufacturing. Furthermore, while heavy civil operations achieve an isolated productivity index of 119% relative to the industry average, sub-contractor fragmentation reduces net productivity by 12%. The conceptual simulation demonstrates that stabilizing the Lookahead planning window through the Last Planner System, Takt planning, and WIP capping increases plan reliability (PPC > 80%), compresses total process Lead Time by 46.2% (from 45.0 to 24.2 days [95% CI: 22.5–25.9 days]), stabilizes workflow reliability at a mean PPC of 82.4% [95% CI: 79.8–85.1%], and reduces Work-in-Progress queue buffers by 78.5% (from 55 to 11.8 active units [95% CI: 10.4–13.2 units]). The research establishes a predictable operational baseline, mitigating multi-tiered waste propagation across civil engineering infrastructure delivery.
No takes yet. Share an insight, caveat, or question.
Serrano et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: