Run-of-river small hydropower (SHP) can electrify off-grid mountain communities in Central Asia, but national assessments rely on coarse runoff grids and fixed capacity factors. We assess 949 reaches of the glacierised Sary-Jaz basin (Tien Shan, Kyrgyzstan) by combining twelve winters of Sentinel-1 backscatter to detect river ice, a degree-day discharge model forced by ERA5-Land and CHIRPS, and a levelised cost of electricity (LCOE) framework. Energy is computed from a screening capacity factor or simulated daily flow, and uncertainty is examined with Monte Carlo, multi-SSP and lifetime analyses. Screening LCOE without ice is 72–544 USD/MWh (median 147). Without ice, the 20–50% glacier-fraction class is cheapest (139.5 USD/MWh), but SAR-derived ice derating shifts this to the 5–20% class (146.7 versus 152.3 USD/MWh). The shift persists with flow-based energy (156.8 versus 162.7 USD/MWh) and needs a shutdown fraction of only 0.00–0.14. Because simulated winter flow mostly falls below the minimum turbine flow, this derating is an upper bound; with generation-weighted derating the classes are tied at present, but the 5–20% class remains cheaper in all eight SSP snapshots. With reach-level cost uncertainty, it is cheaper in 63% of 2000 Monte Carlo realisations, a probable tendency rather than a certainty. Under SSP2-4.5, the 50–100% class loses 24% of its design discharge by 2080; its lifetime LCOE rises from 173 to 180 USD/MWh between commissioning years 2030 and 2050, whereas the 5–20% class stays near 152 USD/MWh. No reach approaches the ≈46–52 USD/MWh feed-in tariff; tariff reform or concessional finance is required.
No takes yet. Share an insight, caveat, or question.
Lee et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: