Answers are grounded in this paper and cite their sources.
Hand sorting looks like a furniture problem — how big a frame of pigeonholes to build — and is actually a decision about passes, reach and errors. A sorter can work comfortably with at most a stated 48 compartments within reach. An office sorting for 180 delivery rounds therefore cannot sort in one pass; the computed two-pass plan uses 13 first-pass area groups and 14 compartments in all, at a handling time of 135.0 minutes for 900 items. The second pass is not free: at a stated mis-sort rate of 0.8 percent per pass, two passes raise the expected mis-sort share from 0.8 percent to 1.59 percent. The paper tabulates the plan for 12 to 320 rounds and gives the rule: one pass to the reach limit, two passes with a square-root split beyond it, and a third pass only when the frame, not the sorter, is the constraint. SIMULATED, NOT MEASURED.
No takes yet. Share an insight, caveat, or question.
William Alexander Aldred (2026) studied this question.
Synapse has enriched 8 closely related papers on similar clinical questions. Consider them for comparative context: