Answers are grounded in this paper and cite their sources.
This study examines the empirical nexus between early-stage budgeting bias, post-award contract execution timelines, and macroeconomic sustainability within India’s premier construction agency, the Central Public Works Department (CPWD). Moving away from subjective stakeholder surveys, this paper uses an unaggregated, project-specific baseline built from two large-scale historical datasets (n = 994 for planning; n = 861 for execution). A parametric paired t-test confirms a systemic pre-award overestimation trend (t (993) = 14.83, p < .001), with baseline preliminary estimates exceeding final expenditures by an average of ₹1,319.98 lakhs. This practice creates an artificial capital lock-up that directly undermines SDG 9. Conversely, multiple linear regression reveals that post-award schedule delays exhibit a minor but statistically significant negative partial correlation with cost overruns (β = -.09, p = .012), supporting the budgetary cushion hypothesis. Prolonged project standstills do not drive linear cost growth; instead, they cause execution halts that freeze expenditures while causing severe environmental degradation, raw material waste, and compromises on green design standards (SDG 12, SDG 13). Ultimately, this paper outlines data-driven validation filters, such as Reference Class Forecasting, to mitigate artificial resource tie-ups and optimize public funds for sustainable infrastructure networks.
No takes yet. Share an insight, caveat, or question.
Pramod et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: