Answers are grounded in this paper and cite their sources.
Full-face tunnel boring machines (TBMs) in deep coal-mine roadways require coordinated geometric and operational control for small-radius turning. Using the EQC5030 open-type TBM and the Xin’an Coal Mine roadway layout as an engineering case, this study develops a theoretical planning framework combining geometric screening, overcutting allowance, differential steering, periodic unloading, and lithology-dependent adjustment. For an effective machine length of 16 m and an articulation angle of 12°, the simplified radius reference is 76.96 m, compared with the project target of 70 m. A common-chord calculation gives a local sagitta difference of 41.93 mm. An 80 mm radial allowance leaves 38.07 mm in this local budget before operational and geological deviations are included. A 1.5 m advance requires an angular increment of 1.23° on the 70 m alignment. Consistent reference coordinates and a proposed unloading schedule are provided, with feedback correction required when the steering increment changes. Calculation checks reproduce the reduced-model results; system-level coupled simulation will be pursued in subsequent research to examine the coordinated control response. The framework links geometric calculations to candidate operating settings and identifies the cutter-envelope, clearance, and equipment-limit checks required for application. It supports preliminary design assessment rather than establishing a revised certified minimum turning radius.
No takes yet. Share an insight, caveat, or question.
Li et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: