Answers are grounded in this paper and cite their sources.
Partial lining removal during tunnel maintenance and widening can alter load transfer between adjacent openings, yet its influence on the mechanical response and damage evolution of small-spaced twin tunnels remains insufficiently understood. A mechanism-oriented investigation was conducted using uniaxial compression tests, two-dimensional digital image correlation (DIC), and three-dimensional LS-DYNA simulations. Six finite-thickness sandstone twin-tunnel specimens with gypsum linings were prepared, with one specimen assigned to each axial lining-removal ratio. The axial lining-removal ratio was defined as η = Lr/La × 100%, where Lr is the removed axial length of the left-tunnel lining and La = 50 mm is the total specimen length along the tunnel axis. Removal covered the full lining thickness and complete horseshoe-shaped circumference within that interval; the right-tunnel lining remained intact. Specimens S1–S6 corresponded to η = 0%, 20%, 40%, 60%, 80%, and 100%, respectively. The nominal peak axial stress decreased from 37.94 MPa for S1 to 24.33 MPa for S6, and the overall elastic modulus of the composite specimen decreased from 4.54 to 2.28 GPa. The crown-displacement histories of the two openings separated progressively earlier as the axial lining-removal ratio increased. DIC fields and post-peak photographs indicated tunnel-perimeter localized damage at η = 0–40%, asymmetric multi-zone damage at η = 60–80%, and removal-side concentrated crushing at η = 100%. These findings clarify how progressive lining removal weakens coordinated load sharing and promotes asymmetric damage concentration in small-spaced twin tunnels, providing a mechanistic basis for targeted monitoring and support during tunnel maintenance and widening.
No takes yet. Share an insight, caveat, or question.
Ji et al. (2026) studied this question.
Synapse has enriched 10 related papers. Consider them for comparative context: